Power Electronics Insights — a PA International technical series
Search for “contract manufacturers in China” and you get lists: top 35, top 13, top 10. Lists are a starting point, not a decision. The factory that is right for a 50,000-unit consumer board is wrong for a 300-unit industrial controller with a 10-year life, and no ranking knows which one you are building. What follows is the vetting routine we use inside our own partner network — the questions that separate a factory that can quote your product from one that can ship it, month after month, to the drawing.
Start with what you are actually buying
“Contract manufacturing” covers four different purchases, and a supplier strong in one is often weak in another: bare-board fabrication (PCB, flex, rigid-flex), assembly (SMT and through-hole, PCBA), box-build (harnesses, enclosures, final assembly and test) and product engineering (DFM, test development, change control). Write down which of the four you need, in what mix, before you look at a single website. A fabricator that subcontracts assembly, or an assembler that buys boards from whoever is cheapest this month, has a second supplier in your chain that you never vetted.
The twelve questions that matter
Ask every candidate the same questions and keep the answers side by side. Vague answers are an answer.
- Who owns the process? Is the plant you are talking to the plant that builds your product, or a trading office in front of several factories? Either can work — but you need to know, because it decides who you call when a lot fails.
- Which standard do they build to, and can they show it on a travelling document? For assembly that is IPC-A-610 (Class 2 for general products, Class 3 for high reliability); for bare boards IPC-6012 or IPC-6013 for flex; for cable and harness IPC/WHMA-A-620. Ask to see the class written on a real work order, not just on a wall.
- Is the quality system audited, and by whom? ISO 9001 is the floor; IATF 16949, ISO 13485 or AS9100 if your market needs them. Ask for the certificate and the last audit’s non-conformance list. A factory that shows you its findings is one that fixes them.
- Who sources the components? Authorised distributors only, or “market” parts when lead times bite? Ask for the approved-vendor list, the counterfeit-avoidance procedure and whether they will buy to your AVL without substitution.
- What do they test, and what do they record? AOI, X-ray for BGAs, in-circuit or flying-probe, functional test, burn-in — and whether results are stored by serial number. “100% tested” means nothing until you know which test.
- How is a change handled? Engineering changes, component substitutions, alternate parts: who approves them, in writing, before the next lot? Ask to see the form. Uncontrolled change is the most common cause of a product that “suddenly” fails after a year of good lots.
- What is the real prototype lead time, with data? Not a sample in a bag — a qualified sample with measurement and test records. Ten to fifteen working days is normal for boards and harnesses; promises of “three days” usually mean the test step was skipped.
- Who talks to your engineers? A sales contact relaying questions overnight, or an engineer who reads your schematic and answers in the same thread? Ask for the DFM report on your own design before you place a tool or stencil order; its quality tells you more than any brochure.
- What happens when a lot fails? Ask for a recent 8D report. A factory that cannot produce one has never done root-cause work for a customer, or will not show it.
- Capacity and your place in it. Line count, shifts, what share of the line your volume would take, and who the biggest customers are by sector. A 500-unit order in a plant built for 100,000-unit runs will always be the job that slips.
- Commercial terms that survive a bad month. Tooling ownership (it should be yours), payment milestones tied to approved samples, MOQ logic you can follow, and who carries the cost of a rejected lot.
- Can you visit, or have someone visit for you? If the answer to a factory audit is no, the answer to the supplier is no.
Four signals you can check before the first call
| Signal | Good sign | Warning sign |
|---|---|---|
| Technical depth of the website | Named processes, classes, tolerances, equipment, and what to send for a quote | Adjectives (“premium”, “one-stop”) and stock photos only |
| Response to a real drawing | Questions about your tolerances, test and volume before a price | A unit price within the hour, no questions |
| Certificates | Current, in the legal name of the plant, scope matches your product | Expired, a different company name, or a scope that excludes assembly |
| Who answers | An engineer with authority to commit | A rotating cast of sales contacts |
Where a partner network fits
Most OEMs cannot run this routine across a dozen plants for every product line, keep the audits current and still get their own product out. That gap is the reason engineering-led intermediaries exist. P&A International works the other way round from a trading company: one engineer owns your project, runs DFM on your design, selects the plant from a vetted network in which every supplier is ISO 9000 certified or better, and stays accountable for the lot through inspection and shipping. The factory builds; the engineering, the vetting and the change control sit with us. If you prefer to vet and manage factories directly, the twelve questions above are the ones to ask — and we are happy to be asked them too.
What to do next
If you are comparing suppliers for a board, an assembly or a complete unit, send the drawing, the annual volume and the standard you need to build to. One dedicated engineer will reply, typically within 48 hours, with a proposed build and indicative pricing — see electronics contract manufacturing for the scope, flexible and rigid-flex PCBs and wire harnesses and cable assemblies for the two capabilities most often asked about, or go straight to the enquiry form.
